Shenyang Xiandai Jixiang Decorative Material Co., Ltd

Shenyang Xiandai Jixiang Decorative Material Co., Ltd

86--15542256990

Shenyang Xiandai Jixiang Decorative Material Co., Ltd
HomeNewsConstruction Method Of Aluminum-Plastic Board Wall Installation

Construction Method Of Aluminum-Plastic Board Wall Installation

2021-05-08
1. Scope of application
Suitable for suspended ceilings (outdoor projects) in balconies, public areas, etc.
2. Operating conditions
1. The structural surface of the aluminum-plastic panel facing should be equipped with embedded parts; when the design does not require embedded parts, expansion screws can be used to install the skeleton.
2. The wooden frame installation should be carried out after the door and window frames are installed, and the wall slate should be carried out after the wall plastering and the ground are completed.
3. The drying of the wood should reach the specified moisture content, and the keel should be brushed with antiseptic on three sides after planing the surface to be laid.
4. The required equipment is installed, the power is connected, and the trial operation is carried out.
5. Before large-area construction, a large-scale drawing should be drawn, and the sample should be made first, and then the large-area construction can be carried out after passing the inspection.
Three, material preparation

According to the design requirements, select aluminum-plastic panels to determine the size of the keel interval; select the appropriate keel section and size. At the same time, the aluminum must be properly kept after entering the site to avoid deformation and scratches.

Four, construction technology
1. Construction process
Keel arrangement and spring line installation and leveling keel installation aluminum-plastic panel trimming and sealing.
2. Keel layout and elastic line
(1) Elastic line: Determine the elevation control line and the keel layout line. If the ceiling has an elevation change, the corresponding position of the variable section should be determined, and then the angle aluminum should be fixed along the elevation line.
(2) Determine the position line of the keel: Arrange the structural size of the ceiling frame according to the size of the aluminum-plastic panel and the area of the ceiling. The pattern of the plate combination is required to be complete. When the sides are left around, the dimensions of the left sides should be uniform or symmetrical. Draw the arranged dragon skeleton position line on top of the elevation line.
(3) Installation and leveling of the keel: According to the vertical and horizontal elevation control line, start from one end, install and level it, and then uniformly fine-tune it again.
3. Block board installation
The installation of the aluminum-plastic panel and the dragon skeleton is mainly hook suspension or self-tapping screw fixation, and wire ties can also be used. When installing, arrange the layout line according to the elastic plate, and install it in sequence from one direction, and pay attention to the hook Fix it with the keel first, and then hook the small hole on the side of the plate; the aluminum-plastic plate should be handled gently during installation to protect the plate from collision or scratches; when fixing with M5 self-tapping screws, first drill out with a hand electric drill Install the screws after the 4.2mm diameter hole.
HomeNewsConstruction Method Of Aluminum-Plastic Board Wall Installation
Related Products List

Home

Product

Phone

About Us

Inquiry

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send